Complete Build Journal

12/18/2015

Measuring Power Brake Mod

power brakes arrived.

To get ready for the installation, I marked on the frame where the support bar will be going.  That way I know where to cut.  I marked the locations of the cutting with painters tape, and made sure that I had enough room for a little slop.  I was able to get the locations for the cut by placing the booster up to the ds wall, and guestimate where it should be placed.

Measured and marked where to cut.

  

Left it ready to do the install Saturday morning.  I don't want to start this project at 10pm tonight.



No comments:

Post a Comment